Universal Registration Document 2024
PRESENTATION OF THE GROUP 1 MAIN HUBS
The 2024-2026 projected investment programme includes: u the renovation and compliance with EASA standards of runway 4 (06/24) and runway 02/20 as well as the associated aircraft taxiways; u the renovation of the W2 taxiway; u the extension of the Golf areas to the north of the platform, to accommodate the new Code E aircraft (A350-1000, B777X), while supporting the evolution of the airlines’ fleets; u the supply, installation and connection of electric PCA (pre-air conditioning) equipment in the Paris-Orly car parks; u continued work to increase the supply capacity of the Paris-Orly hub to meet new needs, and in particular those related to the decarbonisation of airport activities by the electrification of various processes (PCA, electric vehicle charging stations). This work will also improve power redundancy and therefore the robustness of the power supply at Paris-Orly airport;
u the "Ambitions gates E" project at Orly 3, which aims to improve the quality of service offered and ensure the architectural coherence of the area with the latest major projects (RPDI, Orly 3), as well as to create new boarding gates to support traffic growth and improve flexibility in the allocation of airport resources; u the redevelopment of the departure flyover, which will be reserved for taxis and vehicles for hire, and improvements to the security of the Orly 1-2 façades and the pedestrian forecourt; u continuation of the work to bring the P2 car park into compliance; u the rehabilitation of Orly 1 and 2 with the renewal of the security public address system at Orly 1-2 and the associated car parks; u strengthening of the perimeter protection of sensitive areas within the Orly hub.
The main projects included in the proposed 2024-2026 investment programme for the regulated scope are shown in the mapping below:
69
UNIVERSAL REGISTRATION DOCUMENT 2024 w AÉROPORTS DE PARIS
Made with FlippingBook - Online Brochure Maker