2022 Integrated report
LA RÉPONSE STRATÉG I QUE THE STRAT G I C RESPONS
THE STRATEG I C RESPONSE
ONE AMB I T I ON
F I RST CONCRETE ACH I EVEMENTS TO I MAG I NE THE SUSTA I NABLE AND HOSP I TABLE A I RPORT OF TOMORROW
Caveirac photovoltaic solar park
Future multi-modal hub of Paris-Orly
FACILITATING AND DE-CARBONISING OUR ACCESSES: THE PARIS-ORLY MULTI-MODAL HUB
GROUPE ADP INAUGURATES ITS FIRST SOLAR PARK IN FRANCE
BEING A PIONEER
BEING A PIONEER in the offer of multi-modal connections 2024 OPEN THE NEW PARIS-ORLY MULTI-MODAL HUB, WITH THE COMMISSIONING OF THE LINE 14 STATION
While more than 70% of accesses to Paris-Orly are by car - both by employees and passengers (VTC, taxis, personal vehicles), the arrival of the station will improve access and make it more fluid traffic axes, reduce CO 2 emissions and improve air quality around the platform, through the road/rail modal shift.
Several infrastructure projects helping to facilitate access to the Paris region airports are under development and will continue in 2023: work on the Paris-Orly multimodal station, work on the CDG Express tunnel, feasibility studies for the Paris-Orly airport. creation of three bus lines from Paris-CDG serving the department of Val-d’Oise, as wel l as the signature of the agreement for the Roissy-Picardie line. The new Paris-Orly station, which will see line 14 commissioned in the summer of 2024, and line 18 in 2027, supports the multi-modal ambition and the reduction in the quantity of vehicles on the plat forms, by profoundly transforming access to Paris-Orly airport, which will be 25 minutes from the centre of Paris.
The contract provides for the creation of three new solar parks in France for the requirements of Groupe ADP in the departments of Gard, Var and Charente. With an expected annual produc tion of 47 GWh of green energy over a period of 21 years, this direct electricity supply contract repre sents 10% of the annual pre-Covid electricity needs to operate the three Paris airports, or nearly 75% of lighting needs. The Caveirac power plant, the first of Groupe ADP’s three, was commissioned in 2022.
Groupe ADP is among the first French companies to obtain its electricity from solar parks, speci fically built in France for its own needs. As part of the de-carbonisation of its energy, Groupe ADP signed a long-term renewable electricity direct purchase contract with the builder and producer Urbasolar and the electricity supplier GazelEnergie in 2020, a Corporate PPA (Power Purchase Agreement), through which a consumer company obtains its supplies directly from renewable energy parks.
in the excellence and sustainability of operational and construction methods 10 % LOW-CARBON ENERGY IN TERMINALS AND AIRSIDE 40 % EXCLUDING TAKE-OFF AND LANDING 2025 PIONEERS OBJECTIVES
2025 PIONEERS OBJECTIVES
95,000 PASSENGERS EXPECTED EACH DAY AT THE STATION
13,000 PEAK-HOUR PASSENGERS