Universal Registration Document 2024

1 PRESENTATION OF THE GROUP MAIN HUBS

Growth in passenger traffic at Almaty Airport (in millions of passengers)

INTERNATIONAL TRAFFIC

11.4

12.0

13%

9.5

37%

7.4

8.0

17%

6.4

6.1

5.7 5.6

4.9 4.8

4.3 4.6

3.6

4.0

12%

8%

0.0

7%

6%

2021

2016

2017

2019

2015

2014

2013

2018

2022

2024

2023

2020

Russia

Turkey

Domestic

International

United Atab Emirates

Uzbekistan

Thailand

China

Other

Almaty Airport saw very dynamic traffic in 2024 of more than 20% compared to 2023 and welcomed more than 11.4 million passengers thanks to a solid domestic market and very rapid international growth. International passenger traffic by destination and by airline Almaty Airport is served by direct international flights to a total of 66 destinations, operated by 34 different airlines and carriers. Turkish Airlines, Fly Dubai and Uzbekistan Airways are among the international airlines operating in Almaty.

Infrastructure RUNWAYS

Almaty Airport has two parallel runways. The airport currently has 71 aircraft parking stands, of which four are contacted passenger terminal stands. TERMINALS The airport terminal is around 78,000 sq.m., including a 24,000 sq.m. domestic terminal and a new 54,000 sq.m. terminal, which opened in 2024. Almaty handled 11.4 millions passengers in 2024.

Regulatory framework TAV has an 85% stake in the airport and associated fuel and catering companies. The Kazakhstan infrastructure fund holds the remaining 15% interest.

2024 Pax (mpax)

Type/end date of concession

TAV Airports' stake Scope

International fee/pax USD12 for non Kazakh airlines

Domestic fee/pax Exchange differences

Safety fee/pax

Volume guarantee

Concession fee paid

Airport

Almaty

No concession

85 % Airport

11.4

-

No

-

Access Almaty International Airport is located 18 km north-east of Almaty. Public buses, taxis and private vehicles are available as means of transportation.

Investment programme The new international terminal represents an investment of around USD200 million and covers an area of 54,000 sq.m., doubling the airport's passenger capacity. Completed on 1 June, it has a nominal capacity of 7 million passengers, bringing the airport's total capacity to over 14 million. This expansion has also enabled the existing terminal to be converted into a purely domestic one. In accordance with the 2025 Pioneers commitment, the carbon cost is now systematically calculated for Almaty projects exceeding €5 million. In addition, actions are currently being carried out to obtain level 1 ACA certification.

80

AÉROPORTS DE PARIS w UNIVERSAL REGISTRATION DOCUMENT 2024

Made with FlippingBook - Online Brochure Maker