Universal Registration Document 2024

6 FINANCIAL INFORMATION

GROUPE ADP CONSOLIDATED FINANCIAL STATEMENTS AS OF 31 DECEMBER 2024

work to bring metro line 14 into service. This amendment also includes the modification sheets approved since the previous amendment. In addition, two additional agreements were signed on 26 December 2019 with the SGP, one of which relates to cooperation relating to the studies and works necessary for the release of the rights-of-way necessary for the construction of the maintenance and storage warehouse, the ancillary structures of line 14 south of the Grand Paris Express and for the second, on cooperation relating to studies and works to free up the right-of-way necessary for the construction of the ancillary works and the tunnel of line 18 of the Grand Paris Express and support for work carried out under the contracting authority of the Société du Grand Paris. In view of the realisation of the automatic section of line 17 of the public transport network of Grand Paris connecting the Bourget RER station (not included in the so-called "red" line and corresponding to line 17 north) and Mesnil-Amelot, agreements have been signed with the Société du Grand Paris: u Paris - Le Bourget: On 30 November 2018, the Société du Grand Paris entered into a contract with Aéroports de Paris SA carrying a project management mandate for the demolition of building 66 (future location of the Le Bourget Airport station). An amendment to modify the cost of the operation is being finalised. On 17 May 2019, a framework financing agreement was signed with the Société du Grand Paris for the compatibility of the Paris SA airport networks and the SIAH (Syndicat Mixte pour l'Aménagement Hydraulique des Vallées du Croult and du Petit-Rosne) by Aéroports de Paris SA necessary for the construction of an ancillary structure (n° 3501P). On 27 May 2019, two subsequent agreements modified by amendments dated 25 June 2020, one for studies and the other on the execution of works, for works relating to the annex 3501P were signed between Airports de Paris SA and the Société du Grand Paris. On 8 October 2019, Aéroports de Paris SA and Société du Grand Paris signed a compensation agreement for studies and works on buildings A1, A3/A4 carried out by Aéroports de Paris SA necessary for the construction of the Le Bourget station Line 17 airport; u Paris-Charles de Gaulle: on 20 December 2019, an indemnification agreement was signed by the SGP for the interventions that the Group must carry out on the structures it owns and concerning the preparatory work for the construction of the metro line 17 of the Grand Paris Express. On 20 January 2020, Aéroports de Paris and SGP signed a cooperation agreement in the Paris-Charles de Gaulle airport area for data exchange and collaboration; u on 1 April 2021, a protocol of agreement was signed between Aéroports de Paris and SGP to set out the general principles of the parties' commitment to the implementation of line 17 north at Roissy-Charles de Gaulle airport. It also sets out the preparatory work or additional works that are the subject of specific agreements, including: u a study agreement for a pre-bridge link (1 April 2021), u amendments to the preparatory work agreement for additional work and updated deadlines,

u an amendment to the preparatory work agreement for additional work, u a framework agreement and its first subsequent contract to support SGP during the study phase only in taking into account ADP constraints in the Line 17 North project in specific airport procedures, u an agreement to finance the dismantling of building 1273P (Tri Bagages Rapide Sud) in Tremblay-en-France and Mesnil-Amelot, in order to clear the site right-of-way for ancillary structure 3704P, required for the construction of line 17 of the Grand Paris Express, u an agreement to finance studies for the MN module/ CG2 station link bridge, u a new framework agreement for airport support services MS02 - Airport support services "During construction". 13.2.5 Relations with Régie Autonome des Transports Parisiens (RATP) An agreement was signed on 16 July 2019 with RATP relating to the conditions for carrying out the tunnel digging works and ancillary works of line 14 south of the Grand Paris Express and for the support of RATP Teams who must go to Transactions with Air France-KLM primarily concern: u the invoicing of aeronautical and ancillary fees; u and rental costs invoiced related to the rental of land and buildings surrounding the airports. 13.2.7 Relations with TAV Construction On 23 September 2021, TAV Construction and Almaty International Airport JSC entered into an engineering, procurement and construction (EPC) contract for an amount of USD197 million related to the construction of a new terminal building, a new general aviation building and a new governmental VIP building. The balance of the EPC contract is USD18 million. The Group signed an EPC contract for an amount of €657 million with a joint venture formed by TAV Construction and Sera related to additional investments for the capacity increase of Antalya Airport. On top of EPC amount, there is a price adjustment mechanism up to 7.5% of the total EPC amount. The balance of the EPC contract is €262 million. The Group signed an EPC contract for an amount of €202 million with a joint venture formed by TAV Construction and Sera related to additional investments for the capacity increase of Ankara Esenboğa Airport. On top of EPC amount, there is a price adjustment mechanism up to 7.5% of the total EPC amount. The balance of the EPC contract is €6 million. safe areas in the airport with regulated access. 13.2.6 Relations with Air France-KLM

630

AÉROPORTS DE PARIS w UNIVERSAL REGISTRATION DOCUMENT 2024

Made with FlippingBook - Online Brochure Maker