3 – C: RISKS RELATED TO THE MANAGEMENT OF MAJOR PROJECTS Groupe ADP is exposed to the risk of non-control of major projects Criticality + Detailed description of the risk factor Groupe ADP is exposed to the risk of non-control of large-scale projects. As part of its activity, Groupe ADP is required to carry out, as the contracting authority or project manager, infrastructure projects that are intrinsically complex and require significant investments and lengthy appraisal procedures and regulatory authorisations. The investment programme proposed by Groupe ADP for the 2023-2025 period is detailed in section 3.3 of this Universal Registration Document. Major projects are also characterised by a long investment cycle (from the design phase to commissioning). As a result, unexpected changes in the volume or structure of air traffic, for example, or significant technological developments, could lead to the latter being ultimately unsuited to requirements. In addition, existing infrastructure may be saturated while waiting for the delivery of new facilities. Lastly, returns on investments could be lower than expected and thus have a negative impact on Groupe ADP’s financial position and outlook. More generally, the completion of these projects may be subject to numerous technical, industrial, operational, economic, regulatory or environmental risks that may delay or even prevent their delivery.

Change in 2024 è

Potential effects for the group u Lack of coordination of construction sites/construction interrupted or abandoned u Project objectives not met u Additional financial costs due to the need to extend projects or reformulate purchasing requirements or inflation u Lack of anticipation and/or consistency in the planning of infrastructures and developments u Difficulty in developing new infrastructures due to the recurring instability of traffic scenarios u Tighter conditions for obtaining administrative authorisations u Saturation of land access from/to platforms Interconnected risks u Risks related to the economic trajectory u Risks related to quality of service u Risks related to network management u Risks related to portfolio management

MAIN RISK MANAGEMENT SYSTEMS The Group has set up an investment project management system based on Executive Committees, mainly the Strategic Investment Committee and the Commitments Committee chaired by the Chairman and CEO. In addition, the Group plans, designs, organises and carries out infrastructure investments to meet medium- and long term airport and strategic needs. It also takes into account

the evolution of society’s expectations in terms of the environment and health and rigorously implements regulatory procedures in terms of the environment and urban planning, monitors technological trends and developments in air transport and is developing a multi modal policy in consultation with transport authorities and local authorities.

116

AÉROPORTS DE PARIS w UNIVERSAL REGISTRATION DOCUMENT 2024

Made with FlippingBook - Online Brochure Maker