Universal Registration Document 2022

F I NANC I AL I NFORMAT I ON

GROUPE ADP CONSOLIDATED FINANCIAL STATEMENTS AS OF 31 DECEMBER 2022

preparatory work or additional works that are the subject of specific agreements, including: ◆ a study agreement for a pre-bridge link (1 April 2021), ◆ an amendment to the preparatory work agreement for additional work, ◆ a framework agreement and its first subsequent contract to support SGP during the study phase only in taking into account ADP constraints in the Line 17 North project in specific airport procedures. Relations with Régie Autonome des Transports Parisiens (RATP) ◆ An agreement was signed on 16 July 2019 with RATP relating to the conditions for carrying out the tunnel digging works and ancillary works of line 14 south of the Grand Paris Express and for the support of RATP Teams who must go to safe areas in the airport with regulated access. Relations with Air France-KLM Transactions with Air France-KLM primarily concern: ◆ the invoicing of aeronautical and ancillary fees; and ◆ rental costs invoiced related to the rental of land and buildings surrounding the airports. Relations with TAV Construction On 16 June, TAV Construction and Almaty International Airport JSC entered into an early works agreement for an amount of USD 20 million upstream of the final works contract (the EPC contract) for the construction of a new terminal of the Almaty airport in Kazakhstan. This early works agreement covers the preparation of the detailed design of the works, obtaining the necessary approvals and licenses, the purchase of goods and materials as well as the construction of a reception hall. Contractual amount has been fully paid to the constructor. On 23 September 2021, TAVConstruction andAlmaty International Airport JSC entered into an engineering, procurement and construction (EPC) contract for an amount of USD 197 million related to the construction of a new terminal building, a new general aviation building and a new governmental VIP building. TAV sub Group signed an EPC contract for an amount of €657 million with a joint-venture formed by TAV Construction and Sera related to additional investments for the capacity increase of Antalya Airport. On top of the contractual EPC amount, there is a price adjustment mechanism up to 7.5% of the total EPC amount.

In addition, two additional agreements were signed on 26 December 2019 with the SGP, one of which relates to cooperation relating to the studies and works necessary for the release of the rights-of-way necessary for the construction of the maintenance and storage warehouse, the ancillary structures of line 14 south of the Grand Paris Express and for the second, on cooperation relating to studies and works to free up the right of-way necessary for the construction of the ancillary works and the tunnel of line 18 of the Grand Paris Express and support for work carried out under the contracting authority of the Société du Grand Paris. In view of the realization of the automatic section of line 17 of the public transport network of Grand Paris connecting the Bourget RER station (not included in the so-called “red” line and corresponding to line 17 north) and Mesnil-Amelot, agreements have been signed with the Société du Grand Paris: ◆ Paris-Le Bourget: On 30 November 2018, the Société du Grand Paris entered into a contract with Aéroports de Paris SA carrying a project management mandate for the demolition of building 66 (future location of the Le Bourget Airport station). An amendment to modify the cost of the operation is being finalized. On 17 May 2019, a framework financing agreement was signedwith the Société du Grand Paris for the compatibility of the Paris SA airport networks and the SIAH (Syndicat Mixte pour l’Aménagement Hydraulique des Vallées du Croult and du Petit-Rosne) by Aéroports de Paris SA necessary for the construction of an ancillary structure (n ° 3501P). On 27 May 2019, two subsequent agreements modified by amendments dated 25 June 2020, one for studies and the other on the execution of works, for works relating to the annex 3501P were signed between Airports de Paris SA and the Société du Grand Paris. On 6 October 2019, Aéroports de Paris SA and Société du Grand Paris signed a compensation agreement for studies and works on buildings A1, A3 / A4 carried out by Aéroports de Paris SA necessary for the construction of the Le Bourget station Line 17 airport; ◆ Paris-Charles de Gaul le: on 20 December 2019, an indemnification agreement was signed by the SGP for the interventions that the Group must carry out on the structures it owns and concerning the preparatory work for the construction of the metro line 17 of the Grand Paris Express. On 20 January 2020, Aéroports de Paris and SGP signed a cooperation agreement in the Paris-Charles de Gaulle airport area for data exchange and collaboration; ◆ on 1 April 2021, a protocol of agreement was signed between Aéroports de Paris and SGP to set out the general principles of the parties’ commitment to the implementation of line 17 north at Roissy-Charles de Gaulle airport. It also sets out the

6

14.3 Relations with senior executives and shareholders Remuneration of senior executives

This change is linked in particular to the appointment in 2022 of an additional member of the Executive Committee; in addition, in 2021, the variable portions of the members of the Executive Committee paid in 2021, in respect of 2020, had fallen by 16% on average. The elements of the final settlement of accounts for those leaving (3) in 2022 are included.

Senior executives at Aéroports de Paris SA are: the Chairman and Chief Executive Officer, the members of the Executive Committee (15) and the Board members appointed by the General Meeting and by the State (11 eligible Board members and 4 censors). The remuneration granted to these executives amounted to €8.5 million in 2022, compared with €7.9 million in 2021.

421

AÉROPORTS DE PAR I S / UN I VERSAL REG I STRAT I ON DOCUMENT 2022

Made with FlippingBook - Online Brochure Maker