Universal Registration Document 2022
PRESENTAT I ON OF THE GROUP 1 MAIN PLATFORMS
In addition, in order to guarantee the safety and robustness of the facilities at Paris-Charles de Gaulle Airport, special emphasis will be placed on investments to maintain the portfolio. In addition to investments dedicated to runways, this involves, for example, the renewal of airside machines, the alignment of Terminal 2D with the BD link, the renovation of the CD car park and the treatment of obsolescence as part of the creation of the TCN ( Trieur Correspondances Nord ) at Terminal 2. In addition, it is planned to dedicate resources to smartisation and targeted customer satisfaction operations. Investments are also planned to improve parking and mobility options. Lastly, this investment program is in line with environmental expectations, in particular with geothermal energy and the electrification of the platform.
◆ the creation of a line maintenance hangar to reduce the downtime of Air France aircraft by avoiding going to the maintenance area; ◆ the redesign of the atmosphere of the Terminal 2E jetty; ◆ the development of freight capacity (airside and handling within the Cargo City and express freight): in a context of sustained development of e-commerce and an air freight activity that has exceeded its pre-crisis levels, additional investments aim to develop the capacities of the Paris Charles de Gaulle platform, with the aim of supporting the development of the all-cargo and express freight business; ◆ the AGEN areas project: the objective of these areas is to bring offshore post capacities into line with the current vision of the nominal capacities of Terminal 2E. The commissioning of these aircraft areas to the east of hall M of Terminal 2E will both reduce taxiing times for the use of remote stations and optimise the productivity of the contact stations enabled by increased double-haulage.
The main projects included in the proposed 2023-2025 investment program for the regulated scope are shown in the map, below:
12
1
6
11
8 10
9
3
5
KEY 1. Rehabilitation of runway 1
7
2. Rainwater master plan: Marne Pipeline 3. Rainwater master plan: Seine watershed 4. Line maintenance hangar 5. Redesign of the atmosphere of the Terminal 2E jetty 6. Development of freight capacity (airside and handling within the Cargo City and express freight) 7. AGEN areas 8. Consistency of terminal 2D with the junction BD 9. Renovation of CD car park 10. Creation of the TCN 11. Looping of the “Francilienne” road 12. Geothermal
4
2
104
AÉROPORTS DE PAR I S / UN I VERSAL REG I STRAT I ON DOCUMENT 2022
Made with FlippingBook - Online Brochure Maker